Skip to content
Monday – Friday: 6:30 a.m. – 4:30 p.m. · Saturday – Sunday: ClosedMonday – Friday: 6:30 a.m. – 4:30 p.m.Electrical Contractor · TX Lic. 000000VerifyGeneral liability insurance · Carrier named on the certificate
1 more license
  • Electrical Contractor · TX Lic. 000000Verify
  • General liability insurance · Carrier named on the certificate

Multifamily electrical · Houston

Wired from the slab to the last cover plate

Fajardo Electrical wires new apartments, townhomes and senior living for developers and general contractors across the Houston area. You get one project manager, a written look-ahead every week and inspections lined up building by building.

  • Apartments
  • Townhomes
  • Senior living
  • Student housing
A high-rise building at night, its edges outlined in yellow lights

Portfolio by unit count

Our biggest jobs, largest first

Each row is one project: the developer, the general contractor and the count we wired.

  • Apartments

    412 units · Tannery Row

    Five stories of wood frame over a concrete garage. Developer: Harlan Street Partners. General contractor: Kessling Builders.

  • Student housing

    340 beds · Kingsley Commons

    Four student-housing buildings near campus. Developer: Brazos Collegiate Partners. General contractor: Tannehill & Rue.

  • Garden-style

    288 units · Cypress Bend

    Garden-style, sixteen buildings with a clubhouse and pool. Developer: Lowry & Pace Residential. General contractor: Rondeau Construction.

  • Senior living

    164 units · Eastgate Commons

    Senior living in three stories, with a shared commons wing. Developer: Sabine Valley Partners. General contractor: Rondeau Construction.

  • Townhomes

    96 units · Mercer Park

    For-rent townhomes in twelve buildings, each with its own meter bank. Developer: Northline Residential. General contractor: Kessling Builders.

Sample projects, clients and counts. Replace each row with a job you can name.

For your prequal file

License and insurance, ready when your compliance team asks

  • License

    • Electrical ContractorVerify

      TX Lic. 000000 · Texas Department of Licensing and Regulation

      The state license a company needs to contract for electrical work in Texas. Look the number up on the state's site before you sign.

  • Insurance

    • General liability insurance

      Carrier named on the certificate

      The certificate goes to your general contractor or owner's rep before work starts, with the additional insured wording your contract asks for.

  • Languages

    • English

      Office and field

    • Spanish

      Owner, general foreman and several foremen

What we install

Everything electrical in the building, from gear to garage

  • Service gear and meters

    Main gear, house panels and the meter stacks the utility inspects.

  • Feeders and under-slab conduit

    Feeders to every building and conduit set before the slab is poured.

  • Unit rough-in

    Boxes, cable and home runs, floor by floor, inspected before drywall.

  • Trim-out and unit panels

    Devices, fixtures and labeled unit panels, set building by building.

  • Corridors, stairs and exit lighting

    Egress and emergency lighting, corridor and stair fixtures, exterior lighting.

  • Garages and amenities

    Garage lighting and power, clubhouse, pool and fitness rooms, site lighting.

How a building gets power

The same six steps on every building

One sequence, so your schedule has one set of dates to plan around.

  • Preconstruction

    We take off the plans, flag long-lead gear such as switchgear and meter stacks, and send the utility the load information it asks for.

  • Underground and slab

    Most Houston buildings sit on slabs, so feeders and unit conduit go in before the pour. We walk the layout with your superintendent first.

  • Building rough-in

    Crews move floor by floor behind the framers. Each wall and ceiling is inspected before drywall covers it.

  • Gear and meters

    Service gear and meter banks are set, labeled to the unit numbers and inspected. On flood-prone sites they sit above the flood elevation the plans set.

  • Energize

    The utility sets the date. We line our final inspection up to land ahead of it, so the building is ready when the utility is.

  • Trim and turnover

    Devices, fixtures and unit panels go in building by building, with a punch list your superintendent can check off on one sheet.

What a general contractor gets

One project manager, one look-ahead, one punch list

A named project manager answers for the job from award to turnover. Every week you get a written look-ahead by building, and every building closes on one punch list, so your superintendent isn't chasing three different people.

  • A look-ahead in writing, by building

  • Inspections booked to your sequence

  • A submittal log you can read

  • Callbacks closed on one list

Two workers in a gutted building with extension cords across the floor

The leads

Who answers your bid and your RFIs

  • Socorro Fajardo

    President and owner

    Socorro owns the company and signs every bid. English and Spanish.

  • Neha Mehta

    Project executive

    Neha is the contact for developers and general contractors from award to turnover, and keeps the look-ahead.

  • Refugio Escobar

    General foreman

    Refugio leads the field crews and walks each building with your superintendent. English and Spanish.

  • Aliyah Washington

    Safety manager

    Aliyah writes the site safety plan and checks ladders, lifts and temporary power before crews start a building.

From the field and the office

What project teams say about the work

“They sent a building-by-building look-ahead before mobilization, and the inspection dates matched it. My drywall crew never waited on a wall.”

Kartik R.Project manager, general contractor

“The meter bank labels matched the unit numbers on the plans. That sounds small until you have two hundred units to energize.”

Ahmad S.Construction manager, developer

“Refugio walked each floor with me before they pulled a wire, in English and in Spanish for my framers.”

Lesly G.Superintendent, general contractor

Sample reviews.

Where we build

Houston and the counties around it

Active projects run from the Katy corridor to Baytown, and from The Woodlands to Pearland.

Harris County

  • Houston
  • Katy
  • Cypress
  • Spring
  • Humble
  • Tomball
  • Jersey Village
  • Baytown

Fort Bend County

  • Sugar Land
  • Missouri City
  • Rosenberg
  • Stafford

Montgomery County

  • The Woodlands
  • Conroe

Brazoria and Galveston counties

  • Pearland
  • League City

We don't take jobs outside the Houston area. If your building is in Dallas or Austin, call us and we will say so plainly.

Before you send plans

Questions from developers and general contractors

What do you need to bid a building?

The plan set with the electrical sheets, the specs and every addendum, plus your bid date and the schedule you are building to. Unit counts and a utility contact help if you have them.

Do you price by the unit or by the job?

From the drawings. Service gear, feeders, unit rough-in, common areas and site power each get their own lines. Unit counts help us compare jobs, but the number comes from the plans.

Who pulls the permits and books the inspections?

We pull the electrical permits for our scope and book each inspection. The utility sets its own energize date, so we line our final inspection up ahead of it.

Do you take single-family or small jobs?

No. We take multifamily, senior living and student housing. A homeowner or a single-family builder is better served by a residential electrician.

Send us the plans

A bid starts with the electrical sheets, the specs and your bid date.